Miami Precision Concrete builds commercial foundations, including footings, grade beams, pile and pier caps, stem walls and pole bases, for retail, office and industrial projects.
Miami sits on oolitic limestone under sand fill, with a high water table and HVHZ hurricane loads under the Florida Building Code.
We bid foundations across Miami-Dade, Broward and Monroe counties & more.

Get a FREE Quote

We dig to the geotech bearing level, get inspector sign-off, then pour footings with epoxy-coated rebar and 2 inches of cover.

Miami limestone often needs chipping above bearing depth. We price rock removal as a unit rate.

We form and pour pile caps and grade beams with embeds and anchor bolts set to survey.

In Brickell and Coral Gables we sequence deliveries and pour in short sections so lanes reopen nightly.

Settled footings or salt-corroded rebar get an engineered fix; water is usually why the concrete cracked.

Wind-load bases for lot lights and pylon signs, often with new commercial parking lots.
We study the plans and geotech report, then bid in writing.
After Sunshine 811 locates, we excavate and dewater trenches.
The special inspector and Miami-Dade RER inspect before the pour.
Foundations cure, get damp-proofing, then backfill.
From plans and a site visit. Depth and rock drive cost.
Porous oolitic bedrock whose depth and hardness vary across a site.
The owner hires the agency; we schedule around it.
We pump trenches and remove softened soil.
Yes, commercial slabs and floors, with one crew.
Yes, across Miami-Dade, Broward and Monroe.