Miami Precision Concrete installs front walkways, side-yard paths and sidewalk connections, and repairs cracked or root-lifted panels that trip people up.
Public sidewalks in Miami-Dade are the city's or county's to maintain, but private work that touches them needs a right-of-way permit and must stay ADA-flat. Big banyan and oak roots leave plenty of heaved concrete.
We take jobs in Kendall, Hialeah and Doral. Curb work is covered in do you need a permit to replace a driveway in Miami.

Get a FREE Quote

We replace dirt paths and sinking pavers with 4-inch reinforced walks, 3 to 5 feet wide, broom finished. Walks run $7 to $13 per square foot, so 150 square feet is about $1,050 to $1,950.

Tree roots tilt many panels here. We remove the panel, assess the roots and rebuild the base, following Coral Gables canopy rules.

Where your project touches the public walk, we pull the permit and match the adjoining walk at no more than 2 percent cross slope.

A stamped border or exposed aggregate dresses up a plain strip and fits Mediterranean Revival and HOA guidelines.

Walks get slick in tropical rain. We use a broom finish, gentler sections and level landings.

A poured path with a swale gives dry footing and ties into a concrete patio or concrete driveway.
We measure, check slopes and roots, then give a written price.
We apply for any permit and call Sunshine 811 before digging, since water and gas lines run under front walks.
We saw-cut clean edges, remove old concrete, compact the base, then pour and tool joints.
We barricade the walk while it cures. Foot traffic is fine after about a day.
Usually the city or county maintains the public walk, so report damaged panels to them. Some HOAs and cities assign repairs to owners.
Broom-finish walks run $7 to $13 per square foot. Steps, stamping, removal and regrading cost extra.
Short term, on a small lift. If roots or a failed base caused it, the panel keeps moving.
Usually not on private property, but work touching the public sidewalk or curb needs a permit.
A medium broom finish across the direction of travel grips best when wet.
A day or two of work, plus any permit approval time.