Miami Precision Concrete hears this often. Same-footprint private replacement often needs little, but a new or widened street connection needs approval, and Miami-Dade RER permitting may apply.
Trees, flood zones and HOA rules can add steps.
We are contractors, not attorneys. Confirm with your city.

Get a FREE Quote
The Miami-Dade County website shows who handles each driveway, and we file the paperwork.
A driveway onto US-1 needs a separate FDOT permit that can take weeks.
Expect 3,000 psi concrete, a 6 inch sidewalk crossing and a cross slope of 2 percent or less.
The Florida Building Code, including HVHZ rules, governs permits. Same-spot flatwork often needs none.
Widening, a new pad or curb cut can trigger zoning review, and Coral Gables and Miami Beach add rules.
FEMA flood zone and Miami-Dade stormwater rules may apply to a big pad poured with an addition.
We check each before we pour.
Root heave is common in Coral Gables; see why concrete cracks in Miami.
Hialeah, Doral, Homestead, Miami Lakes and Aventura run their own approvals.
On a driveway replacement we list permits in the quote, file them and call Sunshine 811.
Same for a sidewalk or walkway; commercial entrances fall under commercial parking lots and driveways.
A sunken but intact drive may only need concrete leveling. Otherwise see driveway cost in Miami, then call (786) 305-3443.